Industrial · CASE STUDY
Tania Water Factory
A 20,000 m² industrial facility in Dammam, delivered in the six months planned.
CLIENTTania
LOCATIONDammam
SECTORIndustrial
AREA20,000 m²
DURATION6 months (plan 6)
COMPLETED2023
PLANNED VS. DELIVERED
Handed over in 6 of 6 months
M1M2M3M4M5M6
PLANNED
DELIVERED
The brief
Tania needed a 20,000 m² industrial facility in Dammam, supporting manufacturing and logistics, on a six-month programme.
What RAC delivered
RAC’s scope covered general construction and MEP systems.
The result
The facility was delivered on time, in the six months planned, in 2023.